|
|
|
|
| LEADER |
00914cam a2200229 7i4500 |
| 001 |
0000000730 |
| 005 |
20151104090000.0 |
| 005 |
##20151104102300.0 |
| 002 |
##000023529 |
| 003 |
##MY-KlINT |
| 039 |
# |
9 |
|y 201511041023
|z VLOAD
|
| 090 |
0 |
0 |
|a MDE(L)627.54
|b INT
|
| 110 |
0 |
# |
|a ICID International Drainage Workshop(
|i 7th:
|j Penang)
|
| 245 |
0 |
0 |
|a Drainage for the 21st Century :
|b 7th ICID International Drainage Workshop, 17-21 November 1997, Penang, Malaysia.
|
| 260 |
# |
# |
|a Kuala Lumpur:
|b Malaysian National Comittee on Irrigation and Drainage (MARCID),
|c 1987.
|
| 300 |
# |
# |
|c 159 p..
|
| 650 |
# |
0 |
|a MDE --
|x Rural Development --
|z Malaysia
|
| 650 |
# |
0 |
|a Hydraulic engineering --
|x Congressess
|
| 650 |
# |
0 |
|a Water resources development --
|x Congressess
|
| 710 |
0 |
# |
|a Jawatankuasa Pengairan dan Saliran Kebangsaan
|
| 745 |
1 |
# |
|a International Comission on Irrigation and Drainage
|
| 999 |
|
|
|a 0000504647
|b BOOK
|c Unknown
|e INTAN BK
|