|
|
|
|
| LEADER |
00875cam a2200241 7i4500 |
| 001 |
0000013597 |
| 005 |
20151104090000.0 |
| 005 |
##20151104114200.0 |
| 003 |
##MY-KlINT |
| 039 |
# |
9 |
|y 201511041142
|z VLOAD
|
| 090 |
0 |
0 |
|a T 658.5421
|b MUH
|
| 100 |
1 |
# |
|a Muhamad Khair bin Hasan
|
| 245 |
0 |
0 |
|a Improving time estimation in JKR project /
|c Muhamad Khair bin Hasan.
|
| 260 |
# |
# |
|a Skudai, Johor:
|b Universiti Teknologi Malaysia,
|c 2010.
|
| 300 |
# |
# |
|a xv, 81p:
|b col. ill;
|c 30cm.
|
| 500 |
# |
# |
|a Koleksi Tesis
|
| 500 |
# |
# |
|a Supervisors: Dr. Mohamad Ibrahim Mohamad
|
| 502 |
# |
# |
|a Thesis (Master of Project Management)
|
| 650 |
# |
0 |
|a Engineering --
|x Civil engineering (general)
|
| 700 |
0 |
# |
|a Mohamad Ibrahim Mohamad
|
| 710 |
0 |
# |
|a Faculty of Civil Engineering, University Teknologi Malaysia
|
| 999 |
|
|
|a 066537
|b BOOK
|c Dissertation
|e INTAN BK
|
| 999 |
|
|
|a 1202068175
|b BOOK
|c Dissertation
|e INTAN BK
|