Improving time estimation in JKR project /
| Main Author: | Muhamad Khair bin Hasan |
|---|---|
| Corporate Author: | Faculty of Civil Engineering, University Teknologi Malaysia |
| Other Authors: | Mohamad Ibrahim Mohamad |
| Format: | Thesis Book |
| Published: |
Skudai, Johor:
Universiti Teknologi Malaysia,
2010.
|
| Subjects: |
Similar Items
-
Contracting for engineering and construction projects /
by: MARSH, P.D.V
Published: (1981) -
Contracting for engineering and construction projects /
by: MARSH, P.D.V
Published: (1981) -
Geophysics method in geological engineering /
by: Youventharan Duraisamy
Published: (2009) -
Civil engineering materials /
by: Achmed Fauzi A. Wahab
Published: (2011) -
Project management : engineering, technology, and implementation /
by: Shtub, Avraham
Published: (1994)